June 30, 2020

Last week, 27 projects from the ARO site card backlog were uploaded, including 26 negative projects and one project with three new courtesy sites. In addition, an updated geometry and site card for AZ T:12:53(ASM), reflecting recent ARO work, were uploaded.

June 24, 2020

Last week, four projects from the ARO site card backlog were uploaded, including two negatives and two projects with eight site updates. In addition, 13 site updates from the AZSITE backlog were uploaded.

June 15, 2020

The Advanced ASM Sites layer was updated on June 12th. The update included more than 500 additional sites from the ARO site card backlog. This brings AZSITE's coverage of backlog original site submissions, in the Advanced ASM Sites layer or the sites layer, up to around 93%. In addition, two projects with seven new sites from the AZSITE backlog were uploaded. 32 site updates associated with these and other projects were also uploaded.

June 8, 2020

Last week, nine projects with 20 new sites from the AZSITE backlog were uploaded. Uploads of updates associated with the projects are pending. Geometry updates for two existing sites were also completed.

May 26, 2020

Last week, 123 negative projects conducted under the new fee structure were uploaded. These included accession numbers from 2016 (three projects), 2017 (22 projects), 2018 (37 projects) and 2019 (61 projects).

May 21, 2020

Last week, 21 negative projects from the backlog and seven new PRFs were uploaded. Details are provided on the 2020 upload list.

May 14, 2020

Today, the Advanced ASM Sites layer was updated and 16 new PRFs were uploaded. Last week, geometries for two projects with 79 new sites were uploaded. In addition, 15 negative projects from the backlog were uploaded, and an updated, consolidated geometry for AZ X:3:5(ASM) was uploaded. Updated site cards for this site, those consolidated into it, and a couple nearby sites were also uploaded. Details are provided on the 2020 upload list.

May 7, 2020

Last week, attributes of the 7.5' topographic quadrangle boundary layer were updated to address a number of gaps and errors. In addition, attributes for two projects (partial, pending updates) and 79 new sites were uploaded; geometries for these records will sync this weekend. In addition, 14 PRFs were uploaded. Details are provided on the 2020 upload list.

April 28, 2020

Last week, attributes for the consolidated AZ U:9:165(ASM) were updated. Fifteen sites were recently consolidated into this site by ARO decision. In addition, 67 PRFs were uploaded. Details are provided on the 2020 upload list.

April 23, 2020

The Advanced ASM Sites layer was updated again on 4/20. Last week, an updated boundary for AZ U:9:165(ASM) was uploaded. Fifteen sites were recently consolidated into this site by ARO decision; updated site cards were uploaded last week. Consolidation of attributes will be completed this week. Details are provided on the 2020 upload list.

April 15, 2020

The Advanced ASM Sites layer was updated today with around 3,300 UTM centerpoints for backlog sites. In the last several weeks, AZSITE and the ARO have added about 3,500 UTM centerpoints for backlog original site submissions to this layer.

April 9, 2020

The Advanced ASM Sites layer was updated today. This layer will be updated frequently in the coming weeks as AZSITE and the ARO compile and add UTM centerpoints for original submissions in the backlog.

Last week, seven projects and three sites were uploaded, including four negative projects, two projects with one new site each, and one project with a site update. Data fixes pertaining to two sites were also completed. Details are provided on the 2020 upload list.

March 30, 2020

AZSITE server software upgrades (to Windows Server 2019, SQL Server 2019 and ArcGIS Server 10.7) are nearly complete. Batch uploads of backlog projects and sites will resume this week.

March 23, 2020

Last week, 119 PRFs and 229 site cards were uploaded to AZSITE. Details are provided on the 2020 upload list. AZSITE server software upgrades (to Windows Server 2019, SQL Server 2019 and ArcGIS Server 10.7) are also underway.

March 12, 2020

Last week, attributes for remaining backlog negative projects with shapefiles were compiled; compilation of geometries was begun and is ongoing, as they must be confirmed by comparison with report details. Several batches of backlog negatives will replicate to the production server this weekend. In addition, work has begun on various AZSITE data fixes identified by the ARO, AZSITE, and users. Details are provided on the 2020 upload list.

March 2, 2020

Last week, a database cleaning operation was performed, making 410 project IDs and 233 site IDs searchable in the AZSITE attribute search. In addition, attributes and geometries for 12 negative projects and two projects with one new site each were uploaded, as well as nine new PRFs. Details are provided on the 2020 upload list.

February 24, 2020

Last week, PRFs for 24 projects were uploaded to AZSITE. Attributes and geometries for one negative project and one project with a new site were uploaded to AZSITE. Details are provided on the 2020 upload list. Look for more frequent updates in this space in the coming weeks.

February 11, 2020

This space will be updated to inform users as data are added to AZSITE.