Download a current list of AZSITE uploads conducted in 2022
Over the past two weeks 45 backlog new sites and a site boundary correction were uploaded. 66 new PRFs were also uploaded. The Advanced ASM Sites layer was updated on 11/21/2022.
Reminder: We are now accepting applications for AZSITE access in calendar year 2023.
Over the past several weeks 15 projects (13 backlog), 84 new sites (79 backlog), and a number of site updates (ARO site consolidations and updates, backlog basic updates, and data fixes) were uploaded. 24 new PRFs and 7 new or updated ASM site cards were also uploaded. The Advanced ASM Sites layer was updated on 10/20/2022.
We are now accepting applications for AZSITE access in calendar year 2023.
In the past several weeks 7 projects (6 backlog, 1 courtesy), 167 new sites (156 backlog), and a number of site updates (ARO site consolidations, backlog basic updates, and data fixes) were uploaded. 56 new PRFs and 14 new or updated ASM site cards were also uploaded. The Advanced ASM Sites layer was updated on 9/16/2022. ASM backlog upload progress stands at 90% of projects and 88% of new sites, with 80% of site updates present to at least a basic level.
In the past several weeks 17 projects (6 backlog), 228 new sites (225 backlog), and a number of site updates (ARO site consolidations, backlog basic updates, and data fixes) were uploaded. 11 new PRFs and 40 new or updated ASM site cards were also uploaded. The Advanced ASM Sites layer was updated on 8/19/2022. ASM backlog upload progress stands at 90% of projects and 86% of new sites, with 80% of site updates present to at least a basic level.
In the last couple weeks two backlog projects, 214 new sites (197 backlog, 17 new ARO fee structure), and a number of site updates (ARO site consolidations, backlog basic updates, and data fixes) were uploaded. Three new or updated ASM site cards were also uploaded.
Over the past month 16 projects (5 backlog, 11 new ARO fee structure), 160 new sites (157 backlog, 3 new ARO fee structure), and a number of site updates related to ARO site consolidations were uploaded. 15 new ASM PRFs and 131 new or updated ASM site cards were also uploaded.
Over the past two weeks two backlog projects, 48 new sites (47 backlog, 1 new ARO fee structure), and one basic site update from the backlog were uploaded. Two new ASM site cards were also uploaded, and an effort to identify outdated ASM site cards and broken site card links in our document search is underway. Two minor data fixes were implemented. Finally, updated NRHP eligibility determinations and undertakings data have been obtained from SHPO and incorporated into AZSITE data.
April's uploads included 55 projects (41 backlog, 12 new ARO fee structure, 2 miscellaneous), 285 new sites (236 backlog, 48 new ARO fee structure, 1 miscellaneous), and 127 site updates (ASM consolidations and basic backlog updates). 56 new PRFs and 51 new or updated site cards were also uploaded. Five project boundaries were corrected. Finally, data clip deliverables have been updated to include SHPO NRHP eligibility determinations for sites in the advanced ASM sites layer.
Over the past two weeks, two backlog projects, two legacy projects and 10 new fee structure projects have been uploaded. 61 original site recordings were uploaded from the backlog, along with five new fee structure original site recordings; available NRHP determinations for these sites were also uploaded. 36 new or updated ASM site cards were also uploaded. A number of site updates, data fixes and ASM site consolidations are also now reflected in AZSITE.
Over the past two months, three backlog projects and 11 new fee structure projects have been uploaded. 192 original site recordings were uploaded from the backlog, along with 83 new fee structure original site recordings; available NRHP determinations for these sites were also uploaded. Three new ASM PRFs and 93 new or updated ASM site cards were also uploaded. A number of data fixes and ASM site consolidations are also now reflected in AZSITE.
Over the past several weeks, 161 projects and 103 original site recordings were uploaded from the backlog. Site cards for most of these backlog site recordings are pending ARO curation. 252 basic site updates related to these backlog projects were also added to the databsae. In addition, 10 new ASM sites recorded under the new ASM fee structure were uploaded, along with 13 new PRFs. Finally, a new round of SHPO project and site data were obtained and added to the database.
Overall, in 2021 we uploaded 2225 projects, 4087 sites, and 5033 site updates. AZSITE's progress uploading ARO Site Card Backlog items stands at 87% of projects, 71% of sites (the remaining 29% are in the advanced ASM sites layer), and 73% of site updates (to a basic level).