NEW and UPDATED DATA THIS WEEK

View Details

November 4, 2024

This month, we have uploaded 68 projects (ASM backlog and new fee structure), 37 new sites (ASM backlog and new fee structure), 71 ASM site updates (basic backlog and new fee structure), 70 new and updated ASM site cards, 21 ASM PRFs, and 73 ASM reports. 10 data fixes were completed.

October 1, 2024

This month, we have uploaded 54 projects (ASM backlog and new fee structure, USFWS), 95 new sites (ASM backlog and new fee structure, USFWS), 25 ASM site updates (basic backlog and consolidations), 9 updated ASM site cards, 46 ASM PRFs, and 54 ASM reports. 16 data fixes were completed.

September 11, 2024

The AZSITE manager will be on parental leave 9/16 through 9/27. From 9/30 through 11/22 he will be working half-time while on parental leave. AZSITE GIS Technician Ellie Renteria should be your primary point of contact for questions related to AZSITE data and applications between 9/16 and 9/27. She will continue to focus on data uploads and fixes, and will also process data clip requests.

Any problems related to application functionality will be forwarded to our server management/development team at ASU Geospatial Research and Solutions

Due to the University of Arizona financial action plan, we have not been permitted to obtain additional staffing during my leave. As a result, AZSITE administrative functions will be delayed, particularly from 9/16-9/27.

September 4, 2024

This month, we have uploaded 70 projects (ASM backlog and new fee structure, USFWS), 66 new sites (ASM backlog and new fee structure, USFWS), 55 basic ASM site updates, 2 updated ASM site cards, 3 ASM PRFs, and 2,031 ASM reports. 28 data fixes were completed.

August 23, 2024

The issue with adding a KML by file or URL to the web map via the Add Data Widget has been resolved. You may need to do a hard refresh (shift + refresh) as well as sign out and back in to the see changes in effect.

July 31, 2024

This month, we have uploaded 96 projects (ASM backlog and new fee structure, USFWS), 67 new sites (ASM backlog and new fee structure, USFWS), 75 basic ASM site updates, 21 ASM site cards, 290 ASU site cards, 15 ASM PRFs, and 88 ASM reports. 5 data fixes were completed.

July 18, 2024

Last night, the following layers were made available in the AZSITE Web Map Application and the Mercator standalone GIS services:

  • Consolidated ASM Sites: This layer serves to keep a record of pre-consolidation ASM site boundaries to assist in research and review where consolidated ASM sites are involved. Feature service endpoint
  • Inactive ASM Sites: This layer serves to keep a record of boundaries and minimal attributes for ASM sites and segments of ASM sites that do not meet the ASM site definition. These may include in-use segments of historic linear sites (e.g., roads, pipelines, and railways), in-use historic structures, historic isolated occurrences (e.g., waste piles with no features), or site boundaries identified only from archival research. The Active Segments field indicates if an entry in this layer has segments that are abandoned and thus meet the ASM site definition. Segments may move out of this layer as they are abandoned. Feature service endpoint
  • Lower Salt River Valley Hohokam Canals: Lower Salt River Valley Hohokam canals polylines, organized into layers by period, as described in "Hohokam Irrigation Longevity and Agricultural Success in the Lower Salt River Valley, Arizona" by Dr. Christopher R. Caseldine. These data were provided to AZSITE by Dr. Caseldine. Attributes include canal system name and time period. Features are separated into layers by time period. Feature service endpoints (0-3) are available here. These data were based largely on historic aerial photographs from 1930-1959, coupled with the maps of Howard and information from CRM reports. Lines that appear dashed are derived from the 1992 Howard map and indicate projected canal trajectories where cross-cut profiles were not available. These data are intended to be used to identify the potential for subsurface canals features in a project area. This layer can be used in conjunction with the Howard Canals layer to identify potential canals.
  • Details on these layers are provided in the AZSITE Data tab of our User Guide. Metadata is also available at the ArcGIS server rest endpoints.

June 3, 2024

This month, we have uploaded 37 projects (ASM new fee structure), 1 new ASM site, 32 basic ASM site updates, 75 ASM PRFs, and 31 ASM reports. 3 data fixes were completed.

May 13, 2024

We are very pleased to announce that Ellie Renteria has joined AZSITE as a GIS Technician. Ellie comes to us with valuable experience from the CRM industry and a strong GIS background. Ellie is currently working half-time with a focus on data uploads. She will be a major asset to AZSITE as we continue to make improvements.

May 1, 2024

This month, we have uploaded 16 projects (ASM new fee structure), 16 updated ASM site cards, 58 ASU site cards, 84 ASM PRFs, and 10 ASM reports. 4 data fixes were completed.

April 1, 2024

This month, we have uploaded 14 projects (ASM new fee structure), 231 ASU site cards, 24 ASM PRFs, and 12 ASM reports. 6 data fixes were completed.

March 20, 2024

AZSITE is hiring! Our request for a waiver from the UA hiring freeze was recently granted, and AZSITE is now hiring a 0.5 FTE AZSITE Database Technician. This position is benefits-eligible with remote work possible. Find the full job description and application form here.

March 4, 2024

This month, we have uploaded 8 projects (ASM backlog and USFWS), 15 sites (ASM backlog, ASU, and USFWS), 8 ASM site updates (backlog, basic), 3 ASU site cards, 59 ASM PRFs, and 3 ASM reports. 2 data fixes were completed.

January 29, 2024

This month, we have uploaded 14 ASM projects (backlog and new fee structure), 3 backlog ASM sites, 5 ASM site updates (new fee structure), 241 ASU site cards, 9 ASM PRFs, and 9 ASM reports. 12 data fixes were completed.

January 10, 2024

Sadly, Carrie Schmidt will be leaving the role of AZSITE GIS Technician this week. Carrie has been integral to AZSITE's operation since 2020 and will be sorely missed. Some of her notable accomplishments include her work processing the backlog (now nearly complete) and developing the new public mapping app. Thank you, Carrie!

January 5, 2024

In the last month we have uploaded 10 backlog ASM projects, 22 basic backlog ASM site updates, and 38 data fixes (including ASM, MNA, and ASU site boundary corrections, and document link fixes).

AZSITE's new public mapper is now live. Check it out!

Reminder that you can now request data fixes for individual AZSITE entries from map pop-ups and attribute search detail pages.

Remember to submit your application for 2024 AZSITE access. Visit our forms page for more info.

December 5, 2023

Over the past 2 months we have uploaded 9 projects (8 ASM backlog, 2 USFWS), 63 sites (36 ASM backlog, 26 ASU, 1 USFWS), 23 ASM site updates (22 basic backlog and 1 full), 39 data fixes (including ASM and MNA site boundary corrections, quad boundary additions/corrections, missing documents), 31 site cards (7 ASM, 24 ASU), 1 ASM PRF, and 24 ASM reports.

The land ownership dataset provided on the Mercator server has also been updated to reflect the latest data from the BLM. The new web mapping application utilizes the BLM dataset directly; the legacy mapping application utilizes the Mercator feature service (just updated) for queries, but symbolizes the data using a tile cache that is not being updated. This may result in a conflict between what you see on the screen and what you see when selecting or identifying features.

We have created a Data Fix Request web form. This is currently accessible from the pop-ups for Sites, Projects, and Newly Recorded ASM Sites in the new web mapping application. Corrections to additional types of AZSITE data can also be requested using this form. We will be integrating it into the attribute search pages soon.

Remember to submit your application for 2024 AZSITE access. Visit our forms page for more info.

September 18, 2023

Over the past 1.5 months we have uploaded 10 ASM projects (2 new fee structure, 8 backlog), 113 sites (112 backlog, 1 courtesy), 6 basic ASM backlog site updates, 1 ASM site update, 11 fixes to ASM site boundaries and site card entries, and 1,615 ASM reports.

August 4, 2023

AZSITE's new web applications are live!. This includes an updated web mapping application integrated with an updated attribute search application. A user guide for the updated apps is available here to get you started, and will be updated on an ongoing basis. The new apps will run in parallel with the 'legacy' apps until all the kinks are ironed out.

August 3, 2023

Over the past two months we have uploaded 43 ASM projects (24 new fee structure, 19 backlog), 103 ASM sites (5 new fee structure, 98 backlog), 17 basic ASM backlog site updates, 51 ASM site updates (consolidations and fixes), 131 ASM PRFs, and 54 new and updated ASM site cards. Deployment of our new web mapping application, integrated with an updated attribute search application, is planned to occur within the next week. A user guide for the updated apps is available here, and will be updated on an ongoing basis.

June 5, 2023

Over the past two months we have uploaded 47 ASM projects (42 new fee structure, 5 backlog), 139 ASM sites (5 new fee structure, 134 backlog), 26 basic ASM backlog site updates, two ASM site updates (fixes), 83 ASM PRFs, and 36 ASM site cards. Beta testing of our new web mapping application, integrated with an updated attribute search application, is ongoing. A user guide for the updated apps is available here, and will be updated on an ongoing basis.

April 3, 2023

Over the past several weeks we have uploaded 11 ASM projects (10 backlog), 73 ASM sites (71 backlog), 116 basic ASM backlog site updates, several ASM site updates (site consolidations and fixes), 26 ASM PRFs, and 161 ASM site cards. The Q2 update of SHPO NRHP data is now online. An attribute 'ARO_Project_Status' has been added to the ASM advanced sites layer, providing insight on the progress of each site through the ARO's curation process. We anticipate beta testing of our new web mapping application, integrated with an updated attribute search application, to begin within the next week or so.

March 13, 2023

Over the past several weeks we have uploaded 70 ASM backlog projects, 160 ASM backlog sites, 113 basic ASM backlog site updates, 10 ASM site updates (site consolidations and boundary updates), 106 ASM PRFs, 11 ASM site cards, and 18 data fixes.

January 20, 2023

So far this month we have uploaded 16 ASM projects (8 new fee structure, 8 backlog), 35 ASM sites (backlog), 33 basic ASM site updates (backlog), 40 ASM PRFs, 404 ASM site cards, and 11 data fixes. Site card uploads have included adding files for broken links in AZSITE and rectifying AZSITE's ASM site card library against ASM's digital site card archive.

January 12, 2023

Updated SHPO undertakings, property, and NRHP determination data have been obtained from the SHPO database and added to AZSITE.

January 3, 2023

Total uploads in 2022 were: 172 projects, 1663 sites, 299 site updates, 258 PRFs, 406 site cards, and 48 data fixes. The Advanced ASM Sites layer was updated on 12/23/2022.