December 6, 2021

Last week, one project and 37 original site recordings were uploaded from the backlog. Site cards for 34 of these backlog site recordings are pending ARO curation. In addition, one courtesy project with an associated site recording, and one new ASM fee structure project with 20 original site recordings, were uploaded. Site updates, consolidations, and corrections related to the Gadsden quad mixup are now complete in AZSITE boundaries, attributes, and site cards. A new 2021 Standalone Entry Module version is available with a corrected quads lookup table (as well as several other minor changes). Finally, 15 NRHP determinations were added to the database based on SHPO data for recently uploaded sites.

December 3, 2021

Over the past several weeks, three projects and 153 original site recordings were uploaded from the backlog. Site cards for most of these backlog site recordings are pending ARO curation. In addition, 561 basic site updates were uploaded from the backlog based on recent backlog project uploads. Site card updates and potential boundary updates for these recordings are pending ARO curation.

54 new and updated site cards were uploaded, along with 9 new PRFs. 170 NRHP eligibility determinations for recently uploaded sites were added to the database from SHPO data. Finally, a number of corrections to the quads layer were made, notably including correcting the longstanding mixup in the Gadsden quads. Corresponding updates to AZSITE data are in progress, including a number of ASM site number changes and consolidations. A new standalone entry module will also be distributed with an updated quads lookup table (as well as a number of other changes).

November 1, 2021

Over the past several weeks, 170 projects (75 ASM backlog; 88 new ASM fee structure; 7 older ASM) and 189 original site recordings (175 ASM backlog; 14 new ASM fee structure) were uploaded. Site cards for most of these backlog site recordings are pending ARO curation. 9 new ASM fee structure site updates were also uploaded, including new site cards. 19 new ASM PRFs were also uploaded. Finally, 12 ASM site boundaries and eight ASM project boundaries were corrected.

In addition, three ASM site consolidations by ARO decision are now reflected in AZSITE boundaries, site cards, and attributes. 82 sites were affected. These included:

  • AZ EE:8:235, 236, 237, 351, 355, 356, 357(ASM), now consolidated under AZ EE:8:234(ASM)
  • AZ U:15:6, 20-32, 52-53, 126, 146-147, 237, 240-241, 254-289, 292-299, 302-303, 366, 460, 462, 465, 472-473, 513, and 908-909(ASM), now consolidated under AZ U:15:3(ASM)
  • AZ U:15:396-400(ASM), now consolidated under AZ U:15:474(ASM)
  • October 4, 2021

    Last week, four projects and 87 original site recordings were uploaded from the backlog. Site cards for most of these backlog site recordings are pending ARO curation. In addition, 221 basic site updates were uploaded from the backlog based on recent backlog project uploads. Site card updates and potential boundary updates for these recordings are pending ARO curation.

    In addition, 27 new fee structure ASM sites were uploaded. Site cards for these sites were already online. 19 new PRFs were uploaded. 64 NRHP eligibility determinations for recently uploaded sites were added to the database from SHPO data. Finally, two site boundaries and one project boundary were corrected.

    September 27, 2021

    Over the past two weeks, two backlog projects and five legacy projects were uploaded. 24 new fee structure ASM sites and 135 backlog sites were uploaded. Site cards for most of these backlog site recordings are pending ARO curation; site cards for the new fee structure sites are online. In addition 14 new PRFs and 128 new or updated ASM site cards were uploaded.

    Additional ASM site consolidations within AZ EE:8 are also now reflected in the AZSITE site cards, attributes, and boundaries. These include:

  • AZ EE:8:33, 146, 153, 157, 158, 182, 183, and 299(ASM), now consolidated under AZ EE:8:141(ASM)
  • AZ EE:8:233 and 344(ASM), now consolidated under AZ EE:8:232(ASM)
  • AZ EE:8:162, 164, 165, 191, 225, 226, 229, 230, 241, 242, 343 and 346(ASM), now consolidated under AZ EE:8:163(ASM)
  • Recent consolidations of large numbers of ASM sites in AZ U:15:SW by ARO decision are now reflected in AZSITE's site cards. Boundaries and attributes will be updated in the coming weeks.

    September 13, 2021

    Last week, 94 projects and 19 new sites were uploaded from the backlog. Site cards for these backlog site recordings are pending ARO curation. 20 new fee structure negative survey projects were uploaded, including the first 2021 projects uploaded, along with 13 original site recordings from new fee structure projects. In addition, 22 new PRFs were uploaded. The recent consolidation of AZ EE:8:332(ASM) into AZ EE:8:212(ASM), and AZ EE:8:333(ASM) into AZ EE:8:213(ASM), by ARO decision is now reflected in the AZSITE attributes, boundary, and site cards. 37 other updated site cards were also uploaded.

    September 7, 2021

    Last week, 55 new sites were uploaded from the backlog. Site cards for these backlog site recordings are pending ARO curation. 17 new fee structure projects were uploaded, with associated new site and site update uploads pending. In addition, 25 new PRFs were uploaded, including eight 2021 PRFs, the first 2021 PRFs in AZSITE. The recent consolidation of AZ EE:8:49(ASM) into AZ EE:8:48(ASM) by ARO decision is now reflected in the AZSITE attributes, boundary, and site cards. Two other updated site cards were also uploaded.

    Finally, 48 MNA site boundaries previously missing from AZSITE were digitized or approximated based on MNA records.

    August 30, 2021

    Last week, 159 projects and 135 new sites were uploaded from the backlog. Seven site cards associated with these backlog site recordings were uploaded, and the remainder are pending ARO curation. 447 basic site updates associated with recent backlog project uploads were added to the database. Site cards and potential boundary updates associated with these updates are pending ARO curation. Two updated and four new site cards were also uploaded. 168 NRHP determinations for recently uploaded sites were added to the database from SHPO data. Finally, one site boundary was corrected.

    August 23, 2021

    Over the past two weeks, 34 projects and 149 new sites were uploaded from the backlog. Site cards for these backlog site recordings are pending ARO curation. 13 new fee structure projects, 17 new PRFs, and one updated site card were also uploaded. Finally, one site boundary and one project boundary were corrected.

    August 10, 2021

    Over the past several weeks, 7 projects and 48 new sites were uploaded from the backlog. Site cards for these backlog site recordings are pending ARO curation. Two courtesy sites were also uploaded. 114 new fee structure projects and 3 associated original site recordings were uploaded. Finally, 21 new PRFs and 11 new or updated site cards were uploaded.

    July 20, 2021

    Over the past several weeks, 200 projects, 332 new sites, and 964 basic site updates were uploaded from the backlog. Site cards for these backlog site recordings are pending ARO curation. One courtesy project was also uploaded. Finally, 10 new PRFs were uploaded and 127 NRHP determinations were added to the database for recently uploaded sites.